MAG 218 Photos


ArabicFrançais/French Deutsch/German Italiano/Italian Português/Portuguese Español/Spanish 日本語/Japanese 한국어/Korean 中文(简体)/Chinese Simplified
Copy Arabic link to URL bar or open in new tab.

Wednesday, August 10, 2005

The Construction Site (Pre-construction)

The MAG 218 construction site on 01 August 2005.
Construction expected to begin end of August or beginning of September.

Image hosted by Photobucket.com
MAG Property Development signboard on the Dubai Marina construction wall at plot A23B.

Image hosted by Photobucket.com
The Dubai Marina construction wall fronting the MAG 218 site.

Image hosted by Photobucket.com
Behind the wall lies an open sand pit--no work yet started.

Image hosted by Photobucket.com
Image hosted by Photobucket.com
The same sand pit viewed from the opposite end with the construction wall low in the background before the Marina Heights tower (under construction, at center).

Image hosted by Photobucket.com
A view of the Dubai Marina looking out from the front of the construction site (the Grosvenor Hotel right of center).


Go to latest MAG 218 photos. More images at MAG 218 Gallery.

2 Comments:

  • Should I worry as a purchaser of one of the units in the MAG 218?

    By Anonymous Anonymous, at 10/11/2005 8:03 PM  

  • I suppose you are referring to the delay in construction. I was told that the developers are taking time to secure "the best builders." That sounds rather like sales talk, but I don't think the delay in itself is too much cause for worry. It indicates at least that work won't start until temperatures have begun to cool and Ramadan (which is a very unproductive time as far as work goes) comes to an end at the end of October.

    By Blogger B.D., at 10/13/2005 5:47 PM  

Post a Comment

<< Home