MAG 218 Photos


ArabicFrançais/French Deutsch/German Italiano/Italian Português/Portuguese Español/Spanish 日本語/Japanese 한국어/Korean 中文(简体)/Chinese Simplified
Copy Arabic link to URL bar or open in new tab.

Thursday, March 23, 2006

On An Off Day

MAG Site, Friday, 17 March 2006

Friday in the UAE is a day off for most workers. With the exception of a watchman the MAG 218 site was empty when these photos were taken. (Click on photos to enlarge.)

The most noticible difference since photos were last taken on 26 February is the addition of more equipment and re-organization of the site. Site office and containers have been re-located and the build area has been demarcated.


MAG 218 site with equipment scattered around the perimeter of the build area--a corner of the build area highligted at center right.


Detail: equipment and storage.


Pumping equipment (with detail).


Site office and supply containers repositioned to front end of site.


Crane and storage silos.


Storage silos close-up.


Build area demarkated with trenches.


Trench dug in on two sides of the build area.

Q1: What exactly are the silos used for?
Q2: TEC, the company logo seen in some of the photos, is what company?
Reader comment welcome.


Go to latest MAG 218 photos. More images at MAG 218 Gallery.

0 Comments:

Post a Comment

<< Home