A Month in Photos

24 October, A.M.                      24 October, P.M.

26 October                            03 November

17 November                             23 November
24 October - 23 November saw the completion of piling work at the MAG 218, yet the leveling of piles, excavation, paving and sealing of the pit continues. (Select date links above or scroll down to view clickable images.)

Piling in Progress (14 images)
24 October 2006--9:30 a.m.


drilling and piling machines



Arabian Forasol worker





Al Nuami workers





scaffolding along excavation pit wall





rebar rising from piling columns







completed section of pit



excavation pit ramp





[top]
Bird's Eye View (8 images)
24 October 2006--4:30 p.m.


The MAG 218 pit at lower right side of image is in near proximity to the No. 5 Sheikh Zayed Road interchange, under-construction. The vast area in the center of the picture will include both ramps and additional buildings. Sheikh Zayed Road runs across the top of the image.


The Marina Ring Road runs along the right side of the MAG 218 plot as pictured. The towers lobby and parking entrance will face this side with parking exit at top of plot. Marina Heights tower rises at right.


The 70-storey Marina Pinnacle tower's podium structure rises in the foreground with the MAG 218 plot in the background. The planned shopping mall will start between the two towers and run to the other end of the block.


The entire plot is visible with the primary machinery used in piling. The maximum depth is about 15 meters.


Two drilling machines, a pile driver, mobile crane and tractor are visible.




Piles are excavated prior to leveling.


[top]
Men at Work (19 images)
26 October 2006--4:00 p.m.



Piles of rebar stored on the adjacent plot to be cast into piles.























MAG Contracting workers gradually take up their roles.














[top]
Piling Continued (7 images)
03 November 2006--2:00 p.m.














[top]
Piling Completed (8 images)
17 November 2006--6:45 a.m




Piling complete, soil is excavated from around embedded piles, the piles are leveled and a concrete floor is laid at the base of the pit.








The morning sun rises over the southeast wall.






[top]
Excavation and Sealing (11 images)
23 November 2006--6:00 p.m.




Sealing already applied to one section of the excavated pit.






Plastic sheeting is used on the newly prepared surfacing.


Welders remove exposed rebar from piling columns.






New Media City towers rise beyond the MAG 218 wall.


Nearby Dubai Marina No. 1 tower and Al Seef tower rise against the evening sky.


A worker performs his evening prayers on the newly laid floor of the excavation pit.